3rd BR Closet:
6 sq/ft width 3' x depth 2'
Bedroom 2:
132 sq/ft width 11' x depth 12'
Bedroom 2 Closet:
10 sq/ft width 5' x depth 2'
Bedroom 3:
105 sq/ft width 10' 6" x depth 10'
Bedroom 3 Closet:
10 sq/ft width 5' x depth 2'
Dining Room:
116 sq/ft width 11' 8" x depth 10'
Garage:
409 sq/ft width 21' x depth 19' 6"
Hall Bathroom:
40 sq/ft width 8' x depth 5'
Hall Closet:
6 sq/ft width 3' 4" x depth 2'
Kitchen:
178 sq/ft width 14' 8" x depth 12' 2"
Living Room:
266 sq/ft width 13' x depth 20' 6"
Master Bathroom:
70 sq/ft width 8' x depth 8' 10"
Master Bedroom:
187 sq/ft width 12' 4" x depth 15' 2"
Master Closet:
12 sq/ft width 6' x depth 2'
Porch - Front:
156 sq/ft width 20' 10" x depth 7' 6"
PDF Set : $739.50 |
PDF plan sets are best for fast electronic delivery and inexpensive local printing. |
5 Copy Set : $833.00 |
5 printed plan sets mailed to you. |
8 Copy Set : $896.75 |
8 printed plan sets mailed to you. |
Reproducible Set : $905.25 |
For inexpensive local printing / making minor adjustments by hand. 1 printed set, typically on Bond paper. |
Crawlspace: $0.00 |
Ideal for semi-sloped or level lot, home can be built off of grade, typically 18” - 48”. |
Slab: $0.00 |
Ideal for level lot, single layer concrete poured directly on grade. |
Basement: $85.00 |
Ideal for level lot, lower level of home partially or fully underground. |
Wood 2x4: $0.00 |
Wood 2x4 |
Wood 2x6: $127.50 |
Wood 2x6 |
Right-Reading Reverse : $297.50 |
Choose this option to reverse your plans and to have the text and dimensions readable. |
Additional Construction Sets : $42.50 |
Additional hard copies of the plan (can be ordered at the time of purchase and within 90 days of the purchase date). |
Audio Video Design : $85.00 |
Receive an overlay sheet with suggested placement of audio and video components. |
Construction Guide : $33.15 |
Educate yourself about basic building ideas with these four detailed diagrams that discuss electrical, plumbing, mechanical, and structural topics. |
Material List : $80.75 |
A list of building supplies needed to construct the infrastructure of your new house. Please note materials lists will not reflect add-ons such as alternate foundation and framing options. |
*Alternate Foundations may take time to prepare.
*Options with a fee may take time to prepare. Please call to confirm.